For discussion FCR(97-98)18
on 20 June 1997

ITEM FOR FINANCE COMMITTEE
RECOMMENDATIONS OF THE PUBLIC WORKS SUBCOMMITTEE ON NON-AIRPORT CORE PROGRAMME

At the Enclosure is a summary of the recommendations of the Public Works Subcommittee (PWSC) made at its meeting on 4 June 1997. The relevant papers have previously been forwarded to all Members for consideration by the PWSC and are therefore not enclosed.

2. Members are invited to approve the PWSC recommendations.

Finance Branch
June 1997


Enclosure to FCR(97-98)18

Summary of the Recommendations of the Public Works Subcommittee made at its meeting on 4 June 1997

Project code

Project description


Recommendation

62KA
PWSC(97-98)34
(Head 703)

Provision of permanent facilities to Government Dockyard on Stonecutters Island


To recommend to Finance Committee the upgrading of 62KA to Category A at an estimated cost of $250 million in money-of-the-day prices for the provision of permanent facilities to the Government Dockyard on Stonecutters Island.

47AP
PWSC(97-98)35 (Head 703)

Improvements to Government Dockyard - remaining works


To recommend to Finance Committee the upgrading of 47AP to Category A at an estimated cost of $214.2 million in money-of-the-day prices for the proposed remaining improvements to the Government Dockyard.

30GK
PWSC(97-98)36 (Head 703)

Maintenance depot for the Water Supplies Department, the Architectural Services Department and the Drainage Services Department at Cheung Sha Wan


To recommend to Finance Committee the upgrading of 30GK to Category A at an estimated cost of $391.9 million in money-of-the-day prices for the construction of a maintenance depot for the Water Supplies Department, the Architectural Services Department and the Drainage Services Department at Cheung Sha Wan.

214ES
PWSC(97-98)37 (Head 703)
215ES

PWSC(97-98)37 (Head 703)
216ES

PWSC(97-98)37 (Head 703)
220ES

PWSC(97-98)37 (Head 703)

First secondary school in area 16, Tuen Mun

Secondary school in area 7, Tai Po

Secondary school in Aldrich Bay reclamation, Shaukeiwan

Secondary school in area 3, Tin Shui Wai

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

To recommend to Finance Committee the upgrading of 214ES, 215ES, 216ES and 220ES to Category A at an estimated cost of $337.2 million in money-of-the-day prices for the construction of four secondary schools in the territory.

561TH
PWSC(97-98)38
(Head 706)

Widening of Tolo Highway between Island House interchange and Ma Liu Shui interchange


To recommend to Finance Committee -

a. the upgrading of part of 561TH as 713TH to Category A, entitled "Widening of Tolo Highway between Island House interchange and Ma Liu Shui interchange - detailed design and ground investigation", at an estimated cost of $49.6 million in money-of-the-day prices; and

b. the retention of the remaining part of 561TH in Category B.

222CL
PWSC(97-98)39
(Head 707)

Yuen Long - Tuen Mun corridor : engineering works for new residential areas at Hung Shui Kiu and San Hing Tsuen


To recommend to Finance Committee -

(a) the upgrading of part of 222CL as 486CL, entitled "Yuen Long - Tuen Mun corridor : site formation works for areas 12 (part) and 13 in Hung Shui Kiu", to Category A at an estimated cost of $32.4 million in money-of-the-day prices; and

(b) the retention of the remainder of 222CL, retitled "Yuen Long - Tuen Mun corridor : site formation works for areas 10 and 11 in Hung Shui Kiu", in Category B.

8012QB
PWSC(97-98)41 (Head 708)

Improvement works to voluntary agency camps


To recommend to Finance Committee for approval of a commitment of $129.8 million in money-of-the-day prices for improving fire safety measures in 20 subvented voluntary agency camps.

163GK
PWSC(97-98)42
(Head 703)

Local marine traffic control station at Container Terminal No. 8


To recommend to Finance Committee the upgrading of 163GK to Category A at an estimated cost of $89.8 million in money-of-the-day prices for the construction of a local marine traffic control station at Container Terminal No. 8, Kwai Chung.

8002MG
PWSC(97-98)43
(Head 708)

Ruttonjee Hospital - air-conditioning


To recommend to Finance Committee the approval of a commitment of $25.18 million in money-of-the-day prices for the installation of a central air-conditioning system at the Ruttonjee Hospital.